Seaway Heavy Lifting Contracting Limited carried out the offshore installation of the Burbo Bank Extension OSS platform. Working under the OSS construction package for the BBW02 transmission assets, Seaway Heavy Lifting was responsible for transporting and installing the prefabricated offshore substation jacket and topside at the site in Liverpool Bay, completing the main offshore hub that connects the array cabling to the export system.