Positive
Project advancing - milestone achieved
Low Impact
Minor progress or informational
Offshore geophysical surveys covering the Burbo Bank Extension site, export cable route and the Irish Sea metmast north were completed, with the results documented in the 2012 "Offshore geophysical surveys" Volume 3 export cable route results report (ref: C12023), providing seabed and route data to support design and consenting of the transmission export cable system.