Global Energy Interconnection Research Institute Co., Ltd. (GEIRI) participated in the BorWin6 consortium contract awarded by TenneT alongside McDermott and C-EPRI Electric Power Engineering. GEIRI/C-EPRI’s scope covered the engineering, manufacture, supply, installation supervision and commissioning of the HVDC system for both the offshore and onshore converter stations.