Dragados Offshore S.A., as consortium partner to Siemens Energy for the BorWin4 (and DolWin4) grid connection projects, was responsible for the design, construction and offshore installation of the offshore converter platforms. The scope included delivery of the offshore platforms (including jackets and topsides) and associated engineering, procurement, construction, transportation, installation and commissioning, with construction planned at Dragados’ yard in Cádiz, Spain.