Allseas was selected by Dragados Offshore to transport and single-lift install the BorWin4 (and DolWin4) 900 MW HVDC offshore converter platforms in the German North Sea. The contract covered transport and installation using Pioneering Spirit, including installation of topsides and jackets and related offshore works such as jacket cut-off and an ROV debris survey.