TWD delivered installation engineering support for Jan De Nul’s foundation installation campaign at Borkum Riffgrund II by designing the upending hinge and various seafastening structures on the jack-up vessel Vole au Vent. The design enabled handling and upending of monopiles and supported safe deck transport and skidding arrangements for installation of 36 foundations.