Assisted CT Offshore with cable route engineering and final engineering documentation for the wind farm’s array cables.
RES provided inter-array cable route engineering support for Borkum Riffgrund 1 in support of CT Offshore’s array cable installation scope. The work included cable routing charts, route position lists, and cable route verification documentation, and RES was re-contracted for the final engineering phase covering the array cable set for the wind farm.