Wikipedia states the test centre "received close to €20 million in public investment" — this appears to refer to BiMEP site funding (site infrastructure including grid connection/substation), but the source...
BiMEP’s export cables were installed using a mix of horizontal drilling for the landfall and conventional subsea cable laying (installation works began in 2012–2013). Water depths across the test area...
Fibre optic:
Each of the BiMEP 13.2 kV export subsea cables is reported as being fitted with embedded fibre optics and the berths provide commercial power and fibre‑optic connectors for swift device...
BiMEP’s export cables were installed using a mix of horizontal drilling for the landfall and conventional subsea cable laying (installation works began in 2012–2013). Water depths across the test area...
Fibre optic:
Each of the BiMEP 13.2 kV export subsea cables is reported as being fitted with embedded fibre optics and the berths provide commercial power and fibre‑optic connectors for swift device...
BiMEP’s export cables were installed using a mix of horizontal drilling for the landfall and conventional subsea cable laying (installation works began in 2012–2013). Water depths across the test area...
Fibre optic:
Each of the BiMEP 13.2 kV export subsea cables is reported as being fitted with embedded fibre optics and the berths provide commercial power and fibre‑optic connectors for swift device...
BiMEP’s export cables were installed using a mix of horizontal drilling for the landfall and conventional subsea cable laying (installation works began in 2012–2013). Water depths across the test area...
Fibre optic:
Each of the BiMEP 13.2 kV export subsea cables is reported as being fitted with embedded fibre optics and the berths provide commercial power and fibre‑optic connectors for swift device...
Onshore Substations
2 fields
Onshore Substation (ES)
Armintza (onshore BiMEP substation), Bizkaia (Basque Country), Spain, Spain