Positive
Project advancing - milestone achieved
Low Impact
Minor progress or informational
By mid‑May 2025, geotechnical seabed surveys at the Bellrock site, conducted by Acteon alongside geophysical investigations, had been completed, with their findings being integrated with metocean data to refine the engineering design of the floating offshore wind farm.