Foundation DesignFoundation ManufactureFoundation Installation
Lifecycle Stages:
DevelopmentConstruction
Contract Details
Description
Subsea 7 managed the design, engineering, fabrication and installation of the Beatrice offshore wind farm pre-piled jacket substructures in collaboration with Seaway Heavy Lifting.