Sulmara was responsible for conducting a UXO survey campaign for the BC-Wind export cable route to support the future installation of transmission/export cables connecting the offshore wind farm to the Polish mainland. Sulmara carried out the survey using its Ocean Marlin vessel, equipped with survey systems including a scanfish, sonar, and magnetometer, operating from the Port of Gdańsk.