Gardline Limited carried out the offshore geophysical and geotechnical survey campaign for the BC-Wind project site and the export cable corridor in the Polish Baltic Sea. The scope described included seabed bathymetry and sonar-based geophysical mapping to support design and installation planning for the offshore infrastructure and the export cable route. The survey campaign was reported as starting in early April 2023 and later reported as completed in 2024.