Following the 2008 failures on the Teigen–Bastøy–Evje cables, Statnett planned a major repair campaign in spring 2009 that would require fully disconnecting the interconnector in order to complete the remaining fault rectification on the Bastøy route, work that had been delayed due to bad weather and limited specialist cable personnel.