MPI Offshore Installation provided offshore installation services for the Barrow project, including installation of the offshore substation that later became part of the Barrow OFTO transmission assets. Within the Barrow Offshore Wind project team, MPI undertook marine installation activities offshore Barrow‑in‑Furness, lifting and positioning major structures such as the substation substructure and topside at the designated site in the East Irish Sea.