AREVA provided the electrical package for the Barrow offshore wind farm’s offshore substation, which later formed part of the Barrow OFTO transmission assets. Within the VKBR project team, AREVA was responsible for the design, supply and installation of the high‑voltage electrical systems on the offshore substation, delivering the first UK offshore wind farm substation. Its scope covered detailed engineering and integration of the substation’s electrical equipment to collect power from the turbine array and export it to shore via the 132 kV export cable.