Meyer Werft (Papenburg, Germany) was assigned a significant portion of the steel construction work (approximately 32,000 tonnes) for the converter platform topsides for the BalWin1 and BalWin2 projects, as part of the platform build led by the Dragados Offshore / Siemens Energy consortium for Amprion Offshore.