Heerema Marine Contractors’ heavy-lift installation vessel Thialf was planned to be used for the transport and installation of monopiles and transition pieces for the Bałtyk 2 and Bałtyk 3 offshore wind farms during the offshore construction campaign. For Bałtyk 3, this related to installation of 50 monopiles and their 50 transition pieces.