Rock laying and seabed preparation; rock layer protects and stabilises export and inter-array cables after installation; carried out by Van Oord for Bałtyk 2 and 3.
Van Oord carried out offshore seabed preparation works for the Bałtyk 2 export corridor as part of the wider Bałtyk 2 and Bałtyk 3 offshore construction campaign. The works included rock laying and seabed preparation to provide erosion (scour) protection for monopile foundation locations and to protect and stabilise export (and inter-array) cables after installation. The scope included precision placement of significant volumes of rock on designated seabed areas using dedicated vessels.