Cadeler signed a reservation agreement with Baltic Power to secure availability of a specialised installation vessel for transport and installation of the offshore wind turbines at the Baltic Power offshore wind farm during the construction phase. The announcement described the scope as transport and installation of “some 70” turbines for the project.