Peter Madsen Rederi (PMR) was responsible for boulder clearance and extensive survey works along the cable routes associated with the Ostwind 2 offshore grid connection that links the Baltic Eagle offshore wind farm (shared with Arcadis Ost 1) to the onshore substation.