Neutral
Informational - no clear directional impact
Low Impact
Minor progress or informational
In 2002, new technical and economic studies on an undersea power cable interconnection between the Azores islands concluded that the solution was uneconomical, primarily due to the high probability of cable failure caused by extreme water depths, a rough basalt seabed and strong ocean currents along the prospective routes.