Neutral
Informational - no clear directional impact
Low Impact
Minor progress or informational
By April 2022, the developer for Awel y Môr had selected a high‑voltage alternating current (HVAC) transmission solution for the project’s export system, deciding that the network transmission voltage would be up to 400 kV with a maximum of two cable circuits, using HVAC export cables as the preferred option due to their efficiency in minimising electrical losses and infrastructure requirements.