By 19 April 2023, Atlantic SuperConnection had completed a full seabed survey to ascertain the optimal subsea cable route between Iceland and the UK. The work, carried out along a corridor of roughly 1,470 km with widely varying water depths, provided detailed bathymetric and geophysical mapping that now underpins the project’s optimal cable routing and engineering design.