IQIP supported DEME and Parkwind during the Arcadis Ost 1 monopile installation campaign by supplying and deploying piling and handling equipment used in foundation installation operations. IQIP stated that equipment deployed on the project included an S-4000 Hydrohammer (with 7000 mm sleeve), the PULSE noise mitigation solution, a 2450t Flanged Pile Upending Tool (FPUT), and a 3000t Combi Lifting Tool (CLT) for installing the project’s large-diameter monopiles.