awarded a contract for the installation and burial of 27 array cables… cable protection systems supply and installation… cable loading and laying, cable burial
Global Offshore (part of the Global Marine Group) was awarded a contract by Parkwind for installation and burial of the Arcadis Ost 1 inter-array cable system. The scope included project management and marine engineering; supply and installation of cable protection systems; pre- and post-lay surveys; cable loading and laying; cable burial; and post-burial survey. Works were scheduled to commence in the second half of 2022 using the cable ships Normand Clipper and Global Symphony.