Dillinger was selected to supply the heavy steel plates used for the XXL monopile foundations for the Arcadis Ost 1 offshore wind farm. The supplied heavy plate steel was used for fabrication of the 27 wind turbine monopiles and the single offshore substation monopile manufactured for the project.