Neutral
Informational - no clear directional impact
Medium Impact
Significant progress or notable issue
Between early October and 22 October 2016, ESB Networks and ESB International carried out a subsea repair on the 10.5 km Aran Islands cable at a 20 m depth off Inis Mór, using in‑house electrical surge techniques to pinpoint the fault and a pressurised habitat system with 97 diving operations to cut out and replace the damaged section, before energising the repaired cable from Inis Mór on 22 October.