SPT Offshore oversaw suction operations during the installation of suction-bucket jacket foundations at Vattenfall’s Aberdeen Bay offshore wind farm (EOWDC). The work was carried out with crane vessel Asian Hercules 3 lifting the jacket into position as part of the foundation installation campaign, and SPT Offshore was also referenced as part of the foundation design team for the project.