Inter-array cables for Yeu-Noirmoutier (EMYN): Prysmian supply; termination and testing by Prysmian; total inter-array cable length about 90 km.
Prysmian supplied the inter-array (infield) submarine power cable system for the Îles d’Yeu et de Noirmoutier (Yeu-Noirmoutier/EMYN) offshore wind farm. Prysmian also carried out cable termination and testing activities offshore from the SOV Island Diligence as part of the inter-array cable works. The installed infield cable system totalled about 90 km and connected the wind turbines to the offshore substation.