Prysmian is in charge of the production and delivery of the inter-array cables for the project... A consortium of LDTVO and Prysmian secured a contract for the supply and installation of inter-array cables... Prysmian was responsible for cable manufacturing.
Prysmian was responsible for manufacturing and delivering the 33 kV inter-array (inter-turbine) submarine cables for the Saint-Nazaire offshore wind farm. The inter-array cables were manufactured at Prysmian’s factories in Montereau-Fault-Yonne and Gron and stored at Saint-Nazaire port prior to installation. Prysmian’s cable scope formed part of the contracted package for supply and installation of the project’s inter-array cable system.