Eiffage Métal, in consortium with DEME Offshore, held an EPCI contract from Eolien Maritime France (EMF) for the Saint-Nazaire project’s 80 steel foundation sets. The consortium scope was stated as engineering/design, fabrication and installation of the foundations, covering both monopile primary structures and transition pieces for the 80-turbine wind farm.