Positive
Project advancing - milestone achieved
Medium Impact
Significant progress or notable issue
By 11 September 2019, GE Renewable Energy had been confirmed as the turbine supplier for the Saint‑Nazaire offshore wind farm, providing 80 Haliade 150‑6 MW units to deliver the project’s 480 MW capacity. The nacelles are manufactured at GE’s Montoir‑de‑Bretagne factory near Saint‑Nazaire, with each turbine featuring a 150‑metre rotor and contributing to about 20% of Loire‑Atlantique’s electricity demand once the wind farm is fully operational.