The Navantia-Windar joint venture was contracted to construct the 62 jacket foundations and associated piles for the Saint-Brieuc offshore wind farm. The jackets were built and assembled at Navantia-Windar facilities in Fene (A Coruña) and the piles were manufactured in Avilés (Asturias).