Schmidbauer performed turbine erection for the three 8.4 MW Siemens Gamesa wind turbines at Provence Grand Large using an LR 11350 crawler crane with PowerBoom (1,350-tonne capacity), supported by a CC2400-1 400-tonne crawler crane. Per Schmidbauer's own project page: "Schmidbauer installed an 8.4 MW wind turbine of the latest generation under the direction of Siemens Gamesa RE." Turbines were lifted onto the TLP floating foundations at port (Gloria Quay in Port-Saint-Louis-du-Rhône, in the Fos-sur-Mer / Marseille area) before tow-out to site approximately 17 km off the coast — the standard floating-wind integration approach.