Marine works for export and inter-array dynamic cables, including route preparation, installation (lazy wave), burial/protection and HDD at landfall.
Asso.subsea executed marine works for the Provence Grand Large cable system in cooperation with Prysmian Powerlink, covering engineering, cable loading of export and inter-array dynamic cables, route preparation, installation and lazy-wave configuration of the dynamic cables, burial and protection operations, and horizontal directional drilling (HDD) at the landing point. Asso.subsea reported completing the cable installation, burial and protection works and stated it covered an installed cable distance of approximately 21,000 m.