Positive
Project advancing - milestone achieved
Medium Impact
Significant progress or notable issue
Turbine installation at sea for Provence Grand Large began in September 2023, with each preassembled floating turbine towed by three tugs to its offshore location before being connected to the previously installed anchoring system.