Vestas supplied and installed the wind turbines for the Prinses Amaliawindpark (also known as Princess Amalia / Q7 Wind Farm), a 120 MW offshore wind farm located around 23–25 km off IJmuiden in the Dutch North Sea. The project comprises 60 Vestas V80-2.0 MW units, and Vestas was identified in multiple project profiles as the turbine supplier for the wind farm. During construction, Vestas carried out offshore wind turbine installation activities, with sources describing an installation period running from May 2007 to November 2007. The turbine installation scope covered the transport and offshore installation of the wind turbine assemblies and commissioning activities required to bring the units into operational readiness within the overall build programme. This role relates to the construction phase delivery of the wind farm’s full turbine package, covering the supply of 60 turbines (V80-2.0 MW class) and their offshore installation as part of the project’s build-out prior to commissioning in 2008. No contract value or award date was stated in the cited material.