Full EPCI responsibility for the inter-array supply and installation contract; design, manufacture, installation, burial, termination and testing of a total of 118 km of 33 kV submarine cables.
Prysmian Group designed, manufactured, installed, buried, terminated, tested and commissioned the 33 kV inter-array (in-field) submarine cable system for the Fécamp offshore wind farm. The scope covered a total of 118 km of 33 kV submarine cables (630 mm² cross-section with aluminium and copper cores) connecting 71 wind turbines to the offshore substation, delivered under a full EPCI inter-array supply and installation contract awarded by EDF Renewables and its partners (secured in 2020).