Fécamp Grand Large 3 is the third of three fixed-bottom offshore wind lots in the Fécamp Grand Large zone (483 km² off the coast of Normandie), included in the merged AO10 / Procédure de Mise en Concurrence n°1/2026 published 21 April 2026 by DGEC. Specified at 1,350–1,400 MW per §2.9.6 of the ca...
Fécamp Grand Large 3 (Projet 3 of Groupe PPE3) was formally included in the French AO10 / Procédure de Mise en Concurrence n°1/2026 with the publication of the cahier des charges rectificatif vCRE on 21 April 2026. The merged 11-project procedure covers approximately 10 GW (5 GW fixed-bottom + 5 GW floating) across Normandie, Bretagne, Charente-Maritime, and Golfe du Lion. First lauréats are expected to be designated end-2026 / early-2027 with a target average attribution tariff below €100/MWh. The cahier introduces, for the first time, EU Net Zero Industry Act supply-chain resilience criteria into the selection scoring.
The 483 km² Fécamp Grand Large zone in the French Manche Est – Mer du Nord façade was designated as a priority area for offshore wind by the ministerial decision of 17 October 2024, following the "la mer en débat" national public debate. The zone hosts three fixed-bottom lots in the AO10 / Procédure de Mise en Concurrence n°1/2026 — Projets 1, 2 and 3 of Groupe PPE3 — each at 1,350–1,400 MW. Fécamp Grand Large 3 is the third lot in this zone, sharing the FEP zone designation, environmental envelope and offshore grid pairing (RTE-built) with its sibling lots.
Showing historic events only. Subscribe for the full timeline including projected milestones.
Upgrade to access detailed cable specifications, supply chain data, projected timeline, financial analysis, and more.
AO10 Projet 3, AO10 Fécamp Grand Large – Lot 3, Fécamp Grand Large – Lot 3