Transport and installation of cables and accessories between each 10 MW floating wind turbine and the EolMed floating electrical hub.
Bourbon Offshore Gaïa was responsible for the transport and installation of the 66 kV dynamic inter-array cables and associated accessories between each 10 MW floating wind turbine and the EolMed floating electrical hub.