Ramboll was responsible for the first phase of basic design and front-end engineering design (FEED) for the project’s jacket foundations, covering the 62 jacket foundation structures for the Dieppe–Le Tréport offshore wind farm developed by Éoliennes en Mer Dieppe Le Tréport (EMDT).