EPCI scope for 120 km of inter-array cables
DEME Offshore was awarded an EPCI contract for the Dieppe Le Tréport offshore wind farm that included the engineering and installation scope for approximately 120 kilometres of inter-array cables. The inter-array cable scope forms part of DEME Offshore’s broader package on the project and covered delivery of the inter-array cable system to connect the turbines within the array to the offshore substation.