33 kV three-core submarine inter-array cable system; around 345 km of cables; Prysmian to supply and install all inter-array cables for Courseulles-sur-Mer
Prysmian Group was awarded by Eolien Maritime France (EMF) a turnkey contract covering the design, supply and installation of the 33 kV three-core XLPE submarine inter-array cable system for the Courseulles-sur-Mer (Calvados) offshore wind farm. The scope covered supplying and installing the inter-array cables connecting the wind turbines within the wind farm array.