general contractor for the onshore cable trench; scope includes design, delivery, and installation of an approximately 8 km long onshore cable section connecting sea exit point near Choczewo to the onshore power station
Ocean Winds selected P&Q as the general contractor responsible for implementation of the onshore cable trench for the BC-Wind export connection in Poland. The agreement covered the onshore cable route of approximately 8 km, connecting the sea exit/landfall area in the municipality of Choczewo to the onshore power station/substation in the same municipality. Construction works were planned to begin in 2026.