design and manufacture of the 220 kV HVAC export cables for Baltyk II and Baltyk III; package of four 220 kV export cables
Hellenic Cables formed a consortium with Jan De Nul Group to deliver the export cable package for the Bałtyk II and Bałtyk III offshore wind farms in Poland, developed by the joint venture of Equinor and Polenergia. Under the consortium scope, Hellenic Cables was responsible for the design and manufacturing of the 220 kV HVAC export cables at its plant in Corinth, Greece. The overall package comprised four 220 kV export cables for the two wind farms; the transport, installation and burial scope was assigned to Jan De Nul Group.