Enprom was selected by Equinor and the Polenergia Group as the contractor responsible for preparing special power cable routes for the Bałtyk 2 and Bałtyk 3 offshore wind farm onshore export grid connections, working alongside Tele-Fonika Kable as the onshore power-cable manufacturer. Per the Polenergia construction-launch announcement: "Polish companies were selected for the production of cables and the preparation of special cable routes — Enprom and Tele-Fonika Kable." Detailed scope figures (corridor length, target dates, percent-complete) are tracked separately and not asserted here.